855 Ruthven Street childcare centre, Toowoomba, with external painting complete and new white picket fencing, August 2026
All projects
Under Construction

Mirambeena Children’s Centre

855 Ruthven Street, Kearneys Spring, Toowoomba QLD 4350

Project

$10M project

Type

Childcare centre refurbishment and repositioning

Scale

Long-term operator secured

Programme

Works commenced May 2026

Construction Timeline

A dated record of the project as it moved through delivery.

May 2026 — works commence at the 855 Ruthven Street childcare centre

Works commence on site. Demolition and internal strip-out begin, exposing the existing roof structure and framing.

June 2026 — demolition into framing at the 855 Ruthven Street childcare centre

External demolition progresses and new framing is installed for the revised store, corridor, staff lounge, office and multipurpose-room opening.

July 2026 — finishes at the 855 Ruthven Street childcare centre

Roof painting, internal and external painting, landscaping, fencing and the stone feature signage wall transform the centre.

August 2026 — final fit-out at the 855 Ruthven Street childcare centre

Base contract works are approximately 97% complete by claimed value, with flooring, joinery, services, fixtures and fencing completed this month.

Project Gallery

Select an image for the full-screen gallery.

The Project

A comprehensive refurbishment and repositioning of an established, purpose-built 130-place early learning centre, leased long-term to Mirambeena Children's Centre Association (Toowoomba) Inc.

The Project

Ultra Urban is delivering a childcare centre development at 855 Ruthven Street, Kearneys Spring. The project takes an established, purpose-built childcare centre — licensed for 130 places and operating on the site since the 1990s — through a comprehensive rectification and refurbishment programme, repositioning it as a premium early learning asset.

The revised building provides dedicated activity rooms, a commercial-grade kitchen and preparation area, children's amenities, staff and administration space, and secured outdoor play areas linked to the internal rooms.

Working with an existing structure required the project team to resolve framing, structural and services details as the building was opened up, with the certifier, designer and builder coordinating those items alongside construction.

Where the Project Is Up To

Works commenced in late May 2026 with demolition and internal strip-out, followed by framing for the revised rooms, stores, corridors, staff lounge, office and multipurpose space.

Services rough-in followed through June. July moved the project into wall and ceiling finishes, painting, landscaping, fencing and the feature entry wall.

August has focused on flooring, joinery, plumbing and electrical fit-off, tiling, sanitary fixtures, doors, hardware and the new fencing to the frontage and play areas.

As at the August progress claim, base contract works were approximately 97 per cent complete by claimed value. Remaining work comprised final electrical, glazing, painting, line marking, landscaping, security, cleaning and close-out items.

The Team

Highmark Group is the builder. Mirambeena Children's Centre Association (Toowoomba) Inc. is the secured operator under a 15-year term to 2041, with options.